HUMANOIDS / MARKET GUIDE

Humanoid software: licences, cloud and data

Check dependencies that determine operation after delivery and after the pilot.

The device is only one layer

Separate base control, task application and fleet management. Each layer may have different accounts, updates and fees. Ask which functions work offline and what happens after connectivity is lost.

Facility data needs ownership and purpose

Define camera, log and recording data shared with support. Record recipients, retention and access restrictions. Use agreed test data; do not assume every session can automatically train the system.

Plan the exit from the pilot

Agree exports of configuration, logs and measurements. Test update recovery and account handover. Continuing-operation cost should include licences and integration maintenance.

HumanoidPoint recommendations concern project preparation. Hardware data comes from the linked manufacturers; it does not confirm an offer or performance at your facility.

HumanoidPoint editorial team · Robotics glossary

Models to explore

Full catalogue ↗
HumanoidApptronik Apollo 2 — manufacturer material
Apptronik

Apptronik Apollo 2

The bipedal Apollo 2 configuration for industrial manipulation development. Confirm application scope, configuration and availability.

Bipedalconfiguration covered
Swappablebattery packs
Fleet Connectoperations layer
Industrial project
HumanoidAgility Digit 5 — manufacturer material
Agility Robotics

Agility Digit 5

A new logistics humanoid generation. Published Digit 5 specifications are preliminary manufacturer estimates.

23 kgpayload — preliminary estimate
2,2 mreach — preliminary estimate
10:1run / charge — target
Preliminary specifications

Model profiles are informational. Device selection requires confirmation of configuration and conditions of use.